Redefining BTR Student Housing in Birmingham: 0 Recalls, Repairs, or Replacements Since 2016
| Property Type: | 20 Build to Rent student units |
| Location: | Birmingham |
| Developer: | Private Developer |
| Postcode: | B3 |
| Services: | Furniture Packages, Window Dressing |
| Result Achieved: | Completed three weeks ahead of schedule and 0 recalls, repairs or replacements since 2016. |

The Challenge
In a BTR scheme, high annual turnover puts pressure on the operational performance, and the furniture must withstand intense daily use while remaining timeless and in good condition to attract tenants each calendar year.
Maintaining consistency across all 20 units was essential while making sure each layout and scheme was suitable for each unit. Durable, modern and comfortable pieces were essential. The property also needed to be easy to manage and quick to let and remain cost-effective in its operation.
The Jewellery Quarter is a prime spot with plenty of student housing, so the furnishing needed to be strategic to reduce void periods and ensure longevity, which is key to BTR success.
Since the client was based in Singapore, we managed the entire project across time zones with clear communication and thorough documentation, ensuring the projects were delivered on schedule and all specifications were met without the client’s physical presence and real-time feedback.

Our Approach
Our swift presentation, transparent communication, suitable pricing, and a comprehensive timeline were clear indications that we understood the complexities of a multi-unit rollout. For an overseas client managing their investment remotely, clarity was essential to gaining confidence that the project would be completed to standards without direct involvement. This foundation of trust proved necessary throughout the project delivery.

Design & Furnishing
The team focused on designs that delivered longevity, standardisation and practicality and maintained a broad appeal. We selected timeless pieces with hard-wearing finishes perfect for repeated tenancies and a calm, neutral colour palette that appealed to a broader demographic.
We focused on furniture pieces that would be robust and easy to maintain. From sturdy bed frames to quality sofas in the living room and low-maintenance tables, every design choice was selected to perform operationally, reduce the likelihood of damage, minimise maintenance issues mid-tenancy, and last long. Window dressings, soft furnishings, and finishes maintained uniformity throughout for easy maintenance and seamless replicability.
Our presentation reflected a clean, clutter-free organisation that is practical and easy to maintain, which is both essential for a student’s lifestyle and supportive of a quick turnaround between tenants.

Operations & Logistics
Precision is central when delivering BTR projects at scale. Our team streamlined the strategy for delivery, installation, and careful disposal of packaging waste. Product supply was scheduled with precision to eliminate double handling, and the furniture arrived exactly when and where it was needed, avoiding storage complications and reducing the risk of damage.
Our installers carried out the work smoothly, completing full inventories for all 20 units within a week and coordinating carefully to maintain consistent quality. We also handled all rubbish and packaging responsibly, ensuring our commitment to ESG is part of every project.
We successfully delivered the project three weeks ahead of schedule, thanks to our systematic approach – a notable advantage for BTR developments where early occupancy means reduced void periods and quicker rental income generation.

The Outcome
There have been 0 recalls, repairs, or replacements on any of the 20 units since they were put together in 2016. This level of long-term reliability gives BTR clients clear operational benefits, such as:
- Lower ongoing and repair costs
- Less management time spent on upkeep
- Stable operational budget
- Decreased risk of void period due to furniture issues
Early Handover
We completed the project three weeks ahead of schedule, enabling the client to begin generating rental income early. This is a significant advantage in BTR schemes, where reduced void periods and quicker occupancy directly impact returns.

High Satisfaction of Remote BTR Client
As an overseas BTR investor, the client needed complete clarity and confidence without being on-site. Our structured communication, transparent documentation, and ability to manage the full installation remotely ensured they could rely on us to deliver a multi-unit scheme to UK standards while operating from anywhere in the world.
Scalable BTR Success
The outcomes echo InStyle Direct’s strength in delivering true scalable BTR solutions, whether it’s a large multi-phase project or a focused student-focused scheme with steady performance, high durability standards, and operational efficiency, all of which make this Birmingham development a fine example of how we apply our BTR principles successfully in every project.